{"id":467198,"date":"2021-08-11T09:20:05","date_gmt":"2021-08-11T07:20:05","guid":{"rendered":"https:\/\/hashtag.al\/?p=467198"},"modified":"2021-08-11T09:20:05","modified_gmt":"2021-08-11T07:20:05","slug":"kardhiq-delvine-kostot-dalin-jashte-kontrollit-29-e-fondeve-per-shtesa-punimesh","status":"publish","type":"post","link":"https:\/\/www.hashtag.al\/index.php\/2021\/08\/11\/kardhiq-delvine-kostot-dalin-jashte-kontrollit-29-e-fondeve-per-shtesa-punimesh\/","title":{"rendered":"Kardhiq-Delvin\u00eb, kostot dalin jasht\u00eb kontrollit, 29% e fondeve p\u00ebr shtesa punimesh","gt_translate_keys":[{"key":"rendered","format":"text"}]},"content":{"rendered":"<p><span style=\"color: #000000;\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-467199\" src=\"https:\/\/hashtag.al\/wp-content\/uploads\/2021\/08\/kardhiqdelvine.jpg\" alt=\"\" width=\"1280\" height=\"720\" srcset=\"https:\/\/www.hashtag.al\/wp-content\/uploads\/2021\/08\/kardhiqdelvine.jpg 1280w, https:\/\/www.hashtag.al\/wp-content\/uploads\/2021\/08\/kardhiqdelvine-300x169.jpg 300w, https:\/\/www.hashtag.al\/wp-content\/uploads\/2021\/08\/kardhiqdelvine-768x432.jpg 768w, https:\/\/www.hashtag.al\/wp-content\/uploads\/2021\/08\/kardhiqdelvine-1024x576.jpg 1024w\" sizes=\"auto, (max-width: 1280px) 100vw, 1280px\" \/><\/span><\/p>\n<p><span style=\"color: #000000;\">Punimet n\u00eb rrug\u00ebn Kardhiq -Delvin\u00eb, q\u00eb kan\u00eb nisur q\u00eb n\u00eb vitin 2007, rreth 14 vite m\u00eb par\u00eb, ende jan\u00eb larg p\u00ebrfundimit, teksa kostot e punimeve po dalin jasht\u00eb kontrollit pasi financimet e buxhetit t\u00eb shtetit po shkojn\u00eb p\u00ebr shtesa t\u00eb punimeve.<\/span><\/p>\n<p><span style=\"color: #000000;\">Ministria e Infrastruktur\u00ebs ka financuar me 534 milion\u00eb lek\u00eb ose 4.3 milion\u00eb euro n\u00eb 4-mujorin e par\u00eb t\u00eb vitit 2021, vet\u00ebm shtesa punimesh n\u00eb Lotet, 4,5,6 dhe 7 t\u00eb rrug\u00ebs. T\u00eb dh\u00ebnat zyrtare t\u00eb azhurnuara n\u00eb raportin e Monitorimit t\u00eb Buxhetit p\u00ebr janar-prill 2021, tregojn\u00eb se me 4.3 milion\u00eb euro jan\u00eb nd\u00ebrtuar 600 met\u00ebr nga rrug\u00eb nga financimi shtes\u00eb.<\/span><\/p>\n<p><span style=\"color: #000000;\">Nd\u00ebrsa n\u00eb projektbuxhetin afatmes\u00ebm t\u00eb publikuar nga Ministria e Financave rruga Kardhiq -Delvin\u00eb \u00ebsht\u00eb programuar t\u00eb financohet gjat\u00eb periudh\u00ebs 2021 deri me 2024 me rreth 6,7 miliard\u00eb lek\u00eb nga t\u00eb cilat 1.7 miliard\u00eb lek\u00eb jan\u00eb shtesa punimesh.<\/span><\/p>\n<p><span style=\"color: #000000;\">Si\u00e7 shihet nga tabelat e Ministris\u00eb s\u00eb Financave n\u00eb buxhetin afatmes\u00ebm kosto fillestare e lot\u00ebve q\u00eb po kryhen punime ishte 5.2 miliard\u00eb lek\u00eb, por me financimet shtes\u00eb kostot jan\u00eb rritur edhe me 29 p\u00ebr qind, duke shkuar nga 5,2 miliard\u00eb lek\u00eb n\u00eb 6.7 miliard\u00eb lek\u00eb.<\/span><\/p>\n<p><span style=\"color: #000000;\">Rruga Kardhiq- Delvin\u00eb ka nj\u00eb histori t\u00eb komplikuar dhe munges\u00eb transparenc\u00eb. Qeveria Berisha n\u00eb vitin 2007 vendosi nd\u00ebrtimin e k\u00ebtij aksi, por punimet u nd\u00ebrpren\u00eb p\u00ebr t\u00eb rinisur n\u00eb vitin 2018 p\u00ebr t\u00eb nd\u00ebrtuar rreth 16 kilometra, pasi punimet p\u00ebr 16 kilometra ishin tashm\u00eb t\u00eb p\u00ebrfunduara.<\/span><\/p>\n<p><span style=\"color: #000000;\">Projekti p\u00ebr 15 kilometrat e mbetura u rishikua, por kostot totale t\u00eb rrug\u00ebs mbeten jo transparente p\u00ebr shkak se ecuria e projektit raportohet i ndar\u00eb n\u00eb 8 lote dhe i shtrir\u00eb n\u00eb shum\u00eb vite.<\/span><\/p>\n<p><span style=\"color: #000000;\">Rruga Kardhiq -Delvin\u00eb e \u00ebsht\u00eb e kategoris\u00eb B me dy korsi m\u00eb gjer\u00ebsi q\u00eb varion nga 10 n\u00eb 17 met\u00ebr. Ky aks synon t\u00eb shkurtoj\u00eb distanc\u00ebn nd\u00ebrmjet Tiran\u00ebs dhe Sarand\u00ebs, duke shmangur Qaf\u00ebn e Muzin\u00ebs. Rruga e cila u konceptua p\u00ebr nxitjen e turizmit kryesisht u kthye n\u00eb nj\u00eb sag\u00eb pa fund dhe kosto t\u00eb pallogaritshme p\u00ebr taksapaguesit.<\/span><\/p>\n<p><span style=\"color: #000000;\">Pak dit\u00eb m\u00eb par\u00eb qeveria publikoi nj\u00eb video t\u00eb shpimit tej p\u00ebr tej t\u00eb tunelit t\u00eb Sk\u00ebrfic\u00ebs 1,3 kilomet\u00ebr t\u00eb gjat\u00eb, pjesa m\u00eb e v\u00ebshtir\u00eb e punimeve, n\u00eb lotin 7.<\/span><\/p>\n<p><span style=\"color: #000000;\">Qeveria njoftoi si afat p\u00ebr p\u00ebrfundimin total t\u00eb punimeve n\u00eb rrug\u00eb dat\u00ebn 7 gusht t\u00eb vitit 2022, por n\u00eb buxhetin afatmes\u00ebm ky aks do t\u00eb financohet deri n\u00eb vitin 2024.<\/span><\/p>\n<p><span style=\"color: #000000;\">E gjith\u00eb vepra ka 8 lote nga t\u00eb cilat punimet tashm\u00eb kan\u00eb p\u00ebrfunduar p\u00ebr 16 kilometra n\u00eb lot\u00ebt 1, 2 dhe 3, teksa punimet po vazhdojn\u00eb n\u00eb lot\u00ebt e tjera.<\/span><\/p>\n<p><span style=\"color: #000000;\">Kostot e rrug\u00ebs u rriten pasi qeveria vendosi vitin e kaluar p\u00ebr t\u00eb rishikuar projektin n\u00eb t\u00eb gjith\u00eb gjat\u00ebsin\u00eb e tij, p\u00ebr ta pajisur me sinjalistik\u00eb t\u00eb gjitha lot\u00ebt n\u00eb gjat\u00ebsin\u00eb prej 32 kilomet\u00ebr, funksion q\u00eb normalisht e kryejn\u00eb kompanit\u00eb q\u00eb realizojn\u00eb punimet.<\/span><\/p>\n<p><span style=\"color: #000000;\"><span style=\"color: #ff0000;\"><strong>VINI RE<\/strong><\/span>: Ky material \u00ebsht\u00eb pron\u00ebsi intelektuale e <span style=\"color: #0000ff;\"><a style=\"color: #0000ff;\" href=\"https:\/\/www.monitor.al\/kardhiq-delvine-kostot-dalin-jashte-kontrollit-29-e-fondeve-per-shtesa-punimesh\/\">Monitor<\/a><\/span><\/span><\/p>\n","protected":false,"gt_translate_keys":[{"key":"rendered","format":"html"}]},"excerpt":{"rendered":"<p>Punimet n\u00eb rrug\u00ebn Kardhiq -Delvin\u00eb, q\u00eb kan\u00eb nisur q\u00eb n\u00eb vitin 2007, rreth 14 vite m\u00eb par\u00eb, ende jan\u00eb larg p\u00ebrfundimit, teksa kostot e punimeve po dalin jasht\u00eb kontrollit pasi financimet e buxhetit t\u00eb shtetit po shkojn\u00eb p\u00ebr shtesa t\u00eb punimeve. Ministria e Infrastruktur\u00ebs ka financuar me 534 milion\u00eb lek\u00eb ose 4.3 milion\u00eb euro n\u00eb [&hellip;]<\/p>\n","protected":false,"gt_translate_keys":[{"key":"rendered","format":"html"}]},"author":51,"featured_media":467199,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[65,13],"tags":[],"class_list":["post-467198","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-lajme","category-te-fundit"],"gt_translate_keys":[{"key":"link","format":"url"}],"_links":{"self":[{"href":"https:\/\/www.hashtag.al\/index.php\/wp-json\/wp\/v2\/posts\/467198","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.hashtag.al\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.hashtag.al\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.hashtag.al\/index.php\/wp-json\/wp\/v2\/users\/51"}],"replies":[{"embeddable":true,"href":"https:\/\/www.hashtag.al\/index.php\/wp-json\/wp\/v2\/comments?post=467198"}],"version-history":[{"count":0,"href":"https:\/\/www.hashtag.al\/index.php\/wp-json\/wp\/v2\/posts\/467198\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.hashtag.al\/index.php\/wp-json\/wp\/v2\/media\/467199"}],"wp:attachment":[{"href":"https:\/\/www.hashtag.al\/index.php\/wp-json\/wp\/v2\/media?parent=467198"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.hashtag.al\/index.php\/wp-json\/wp\/v2\/categories?post=467198"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.hashtag.al\/index.php\/wp-json\/wp\/v2\/tags?post=467198"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}