{"id":430063,"date":"2021-02-15T17:20:36","date_gmt":"2021-02-15T16:20:36","guid":{"rendered":"https:\/\/hashtag.al\/?p=430063"},"modified":"2021-02-15T17:10:25","modified_gmt":"2021-02-15T16:10:25","slug":"projektet-e-impianteve-te-eres-qe-nga-2007-ere-nis-heqjen-e-licencave-per-kater-kompani","status":"publish","type":"post","link":"https:\/\/www.hashtag.al\/index.php\/2021\/02\/15\/projektet-e-impianteve-te-eres-qe-nga-2007-ere-nis-heqjen-e-licencave-per-kater-kompani\/","title":{"rendered":"Projektet e impianteve t\u00eb er\u00ebs q\u00eb nga 2007, ERE nis heqjen e licencave p\u00ebr kat\u00ebr kompani","gt_translate_keys":[{"key":"rendered","format":"text"}]},"content":{"rendered":"<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-430064\" src=\"https:\/\/hashtag.al\/wp-content\/uploads\/2021\/02\/mullinjere.jpg\" alt=\"\" width=\"680\" height=\"456\" srcset=\"https:\/\/www.hashtag.al\/wp-content\/uploads\/2021\/02\/mullinjere.jpg 680w, https:\/\/www.hashtag.al\/wp-content\/uploads\/2021\/02\/mullinjere-300x201.jpg 300w\" sizes=\"auto, (max-width: 680px) 100vw, 680px\" \/><\/p>\n<p><span style=\"color: #000000;\">Kat\u00ebr kompani t\u00eb interesuara p\u00ebr t\u00eb nd\u00ebrtuar impiante eolik\u00eb me plane q\u00eb datojn\u00eb qysh nga viti 2008 jan\u00eb njoftuar nga Enti Rregullator i Energjis\u00eb (ERE) p\u00ebr fillimin e procedurave t\u00eb heqjes s\u00eb licenc\u00ebs.<\/span><\/p>\n<p><span style=\"color: #000000;\"> N\u00eb nj\u00eb nga mbledhjet e fundit t\u00eb k\u00ebtij Enti jan\u00eb b\u00ebr\u00eb t\u00eb ditura edhe arsyet e vendimit duke hedhur k\u00ebshtu posht\u00eb edhe k\u00ebrkesat p\u00ebr zgjatje t\u00eb afatit. Lidhur me kompanin\u00eb e par\u00eb \u201cE-VENTO s.r.l ALBANIA\u201d ERE n\u00ebnvizon se nj\u00eb pjes\u00eb e turbinave, t\u00eb pakt\u00ebn 15 p\u00ebr qnd e tyre kalojn\u00eb n\u00eb zona historike. <\/span><\/p>\n<p><span style=\"color: #000000;\">Po k\u00ebshtu nga ana e Ministris\u00eb s\u00eb Infrastruktur\u00ebs dhe Energjis\u00eb \u00ebsht\u00eb k\u00ebrkuar pran\u00eb ERE q\u00eb t\u00eb mos b\u00ebhet m\u00eb shtyrje e afateve t\u00eb licencave pasi planet e reja t\u00eb investimeve po udh\u00ebhiqen nga kuadri i ri ligjor si dhe projekte q\u00eb po vler\u00ebsohen n\u00eb bashk\u00ebpunim edhe me Bak\u00ebn Europiane p\u00ebr Rind\u00ebrtim dhe Zhvillim.<\/span><\/p>\n<p><span style=\"color: #000000;\">P\u00ebr kompanin\u00eb e dyt\u00eb \u201cERS-08\u201d sh.p.k \u00ebsht\u00eb rr\u00ebzuar s\u00ebrish k\u00ebrkesa p\u00ebr zgjatjen e afatit p\u00ebr vendimin e vitit 2008. Edhe n\u00eb k\u00ebt\u00eb rast ERE citon k\u00ebrkes\u00ebn e MIE.<\/span><\/p>\n<p><span style=\"color: #000000;\">\u201cN\u00eb kuad\u00ebr t\u00eb projektit t\u00eb asistenc\u00ebs q\u00eb MIE ka marr\u00eb nga BERZH-i p\u00ebr nd\u00ebrtimin e parqeveeolike, \u00ebsht\u00eb p\u00ebrcjell\u00eb nj\u00eb MEMO mbi statusin ligjor te licencave ekzistuese per prodhimin ne energjis\u00eb e elektrike nga era dhe revokimin e mundsh\u00ebm te tyre, si dhe nj\u00eb studim mbi zonat potenciale p\u00ebr nd\u00ebrtimin e k\u00ebtyre parqeve eolike dhe zonat n\u00eb t\u00eb cilat, p\u00ebr shkak t\u00eb statusit t\u00eb tyre, nuk mund t\u00eb nd\u00ebrtohen parqe t\u00eb tilla\u201d thuhet n\u00eb vendim. <\/span><\/p>\n<p><span style=\"color: #000000;\">Vendimi i tret\u00eb i ERE lidhet me rr\u00ebzimin e k\u00ebrkes\u00ebs s\u00eb \u201cHERA\u201d sh.p.k. Kjo e fundit sipas nj\u00eb vendimi t\u00eb 2007 i \u00ebsht\u00eb dh\u00ebn\u00eb nj\u00eb licenc\u00eb . n\u00eb aktivitetin e nd\u00ebrtimit, instalimit dhe shfryt\u00ebzimit t\u00eb centraleve elektrik me er\u00eb, si dhe prodhimin e energjis\u00eb elektrike (projekti KAPPET), me fuqi 150 MW.<\/span><\/p>\n<p><span style=\"color: #000000;\">Kompania e kat\u00ebrt p\u00ebr t\u00eb cil\u00ebn ERE ka vendosur t\u00eb rr\u00ebzoj\u00eb k\u00ebrkes\u00ebn p\u00ebr shtyje t\u00eb afatit \u00ebsht\u00eb \u201cBIOPOWER GREEN ENERGY\u201d. <\/span><\/p>\n<p><span style=\"color: #000000;\">Vendimet e ERE-s p\u00ebr nisjen e procedurave t\u00eb heqjes s\u00eb licenc\u00ebs p\u00ebr kompanit\u00eb vijn\u00eb vet\u00ebm pak koh\u00eb pas asaj q\u00eb u n\u00ebnvizua n\u00eb fund t\u00eb vitit 2020 kur kompanive iu lan\u00eb 30 dit\u00eb koh\u00eb p\u00ebr plot\u00ebsimin e kushteve q\u00eb duhet t\u00eb b\u00ebnin kompanit\u00eb.<\/span><\/p>\n<p><span style=\"color: #000000;\"><span style=\"color: #ff0000;\"><strong>VINI RE<\/strong><\/span>: Ky material \u00ebsht\u00eb pron\u00ebsi intelektuale e <a href=\"https:\/\/www.monitor.al\/projektet-e-impianteve-te-eres-qe-nga-2007-ere-nis-heqjen-e-licencave-per-kater-kompani\/\"><span style=\"color: #0000ff;\">Monitor<\/span><\/a><\/span><\/p>\n","protected":false,"gt_translate_keys":[{"key":"rendered","format":"html"}]},"excerpt":{"rendered":"<p>Kat\u00ebr kompani t\u00eb interesuara p\u00ebr t\u00eb nd\u00ebrtuar impiante eolik\u00eb me plane q\u00eb datojn\u00eb qysh nga viti 2008 jan\u00eb njoftuar nga Enti Rregullator i Energjis\u00eb (ERE) p\u00ebr fillimin e procedurave t\u00eb heqjes s\u00eb licenc\u00ebs. N\u00eb nj\u00eb nga mbledhjet e fundit t\u00eb k\u00ebtij Enti jan\u00eb b\u00ebr\u00eb t\u00eb ditura edhe arsyet e vendimit duke hedhur k\u00ebshtu posht\u00eb edhe [&hellip;]<\/p>\n","protected":false,"gt_translate_keys":[{"key":"rendered","format":"html"}]},"author":51,"featured_media":430064,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[65,13],"tags":[],"class_list":["post-430063","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-lajme","category-te-fundit"],"gt_translate_keys":[{"key":"link","format":"url"}],"_links":{"self":[{"href":"https:\/\/www.hashtag.al\/index.php\/wp-json\/wp\/v2\/posts\/430063","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.hashtag.al\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.hashtag.al\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.hashtag.al\/index.php\/wp-json\/wp\/v2\/users\/51"}],"replies":[{"embeddable":true,"href":"https:\/\/www.hashtag.al\/index.php\/wp-json\/wp\/v2\/comments?post=430063"}],"version-history":[{"count":0,"href":"https:\/\/www.hashtag.al\/index.php\/wp-json\/wp\/v2\/posts\/430063\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.hashtag.al\/index.php\/wp-json\/wp\/v2\/media\/430064"}],"wp:attachment":[{"href":"https:\/\/www.hashtag.al\/index.php\/wp-json\/wp\/v2\/media?parent=430063"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.hashtag.al\/index.php\/wp-json\/wp\/v2\/categories?post=430063"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.hashtag.al\/index.php\/wp-json\/wp\/v2\/tags?post=430063"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}